TITLE: 10/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY:
LVEA started out Laser Hazard & will possibly transition to SAFE later today.
LOG:
- 1520 ZM5 transfer function on HAM7 (Rahul)
- 1538 changing offsets for zm4 & zm6 for magnet polarity comparisons
- 1605-1622 TF for ZM2
- Continued ZM4 work in afternoon
- 1524-1731 LVEA/h1psl cleaning (Kim)
- 1534 Karen OUT of LVEA (& will head to EY shortly)
- 1600 1834 Y-arm cleaning (Karen)
- 1536 Moving items, stansion alignment, etc. (Randy)
- 1626 cheryl psl
- 1718 Jason & Varun joining
- lunch break
- 2033 Varun, Jason, Cheryl heading back out
- 1642-1705 Camilla looking for First Contact in lvea
- 1700-1753 Cleaning H2 Room (Kim)
- 1740-1930 EY Turbo work (Kyle, Travis, Gerardo)
- 1745-1851 Turning on ZM4 pzt high voltage for HAM7 (Georgia)
- 1755-1837 Camilla joining
- 1900-2050 Heading out to HAM7 (Sheila)
- 1928 Locking OPO @HAM7 (Georgia)
- 1940-2140 Removing Aux laser at HAM5 (TJ)
- 1955 Lost cameras (LiveClient said cannot connect to server); came back after Richard rebooted server)
- 2000-2040 Bonding lab visit (Camilla)
- 2030-2040 Out to Pcal Lab (Nidhi)
- 2035 HAM7 work (Lee, Wen)
- 2058-2148 Measurements at SQZ rack in the LVEA (Keita)
- 2055-2122 Craning a stansion over beam tube (Randy)
- 2058 Cleaning optics in Beer Garden (Camilla)
- 2257 Went back out to flip optics
- 2059-2122 Out to LVEA to look for stuff (Betsy)
- 2257 Optics Lab work (TJ)
- Possibly transition LVEA to SAFE later