Displaying report 1-1 of 1.
Reports until 08:15, Thursday 21 October 2021
LHO General
corey.gray@LIGO.ORG - posted 08:15, Thursday 21 October 2021 - last comment - 08:25, Thursday 21 October 2021(60352)
Thurs Morning Status

TITLE: 10/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
CURRENT ENVIRONMENT:
    SEI_ENV state: CONSTRUCTION
    Wind: 9mph Gusts, 7mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.50 μm/s
QUICK SUMMARY:

Images attached to this report
Comments related to this report
corey.gray@LIGO.ORG - 08:25, Thursday 21 October 2021 (60354)SEI, SUS

Quick summary of SEI/SUS systems which were addressed:

  • HAM4 ISI was tripped (around Wed 10amPT); restored.
  • BSC2 HEPI + ISI tripped (around Tues 1pmPT); restored.
  • HAM6 ISI tripped (around Wed 10amPT); restored.
  • BSC1 HEPI + ISI tripped (around Tues 1pmPT); restored.
  • There were some IOP DAQKILLS which were also in needs of resets along the way.
  • ETMy & TMSy had Master Switches which were OFF (around Mon 1pmPT); they were restored
  • (accidentally tried returning HAM5, but it's LOCKED)

TCS CO2 x&y lasers are OFF (red).

Displaying report 1-1 of 1.