Mitchell and I installed the baffle on ZM6.
I had to move the tall table Cable bracket one bolt hole to the left (
tagging SEI )
photo.
The SQZ team should check the beams goes though the baffles and adjust as necessary by loosening each set of the nuts shown in
photo. It can then be adjusted and nuts tightened. (
tagging SQZ)