H1 AOS
michael.rodruck@LIGO.ORG - posted 16:01, Friday 12 April 2013 (6060)
Pcal assembly

Pablo, Michael R

We began assembling our second periscope structure in the H2 PSL room. We have the installed the struts, lifting block, suspension rings, and have attached the two large plates together through these pieces. We installed helicoils on plate -727, but we need to torque our screws down before we can flip the structure to get to the other plate.