Reports until 16:04, Friday 12 April 2013
H1 General
andres.ramirez@LIGO.ORG - posted 16:04, Friday 12 April 2013 (6061)
Day Shift Summary
08:00 Reset all the alarm handlers 
08:30 DOE start seismic testing (Local)
08:45 LVEA Transitioned to Laser Safe – Michael R
08:55 Start Transfer Functions on HAM2/HAM3 suspensions – Arnaud P.
09:00 Patrick drive to End Y to check on Dust Monitor
09:15 Start work on BSC2 Beam Splitter – Travis S.
10:00 Reset Watchdogs on PSL – Michael R
10:10 Start assembly work on H2 LAE PCAL – Pablo/Michael R.
11:15 DOE stop seismic testing
11:25 Dust Monitor Installation on End Y - Patrick
14:00 DOE restart seismic testing
15:00   Start B&K Hammer Measurements on BSC2 Beam Splitter – Arnaud/Travis
15:55 Start measurements on HAM 3 ISI – Hugo P