0730 Justin refilling xtal chiller in diode room 0900 LVEA transitioned to Laser SAFE 0920 Filiberto pulling cables along HAM 2/3 0930 Thomas working on OpLev near HAM 2/3 0945 Cyrus to EX 1015 Cheryl torquing bolts HAM 2/3 1020 Arnaud taking quick measurement at BSC2 1030 Gerardo working on periscope and baffle alignment @BSC2 1250 Arnaud taking spectra at PRM 1350 Pablo and Michael R working on periscope assembly in H2 PSL enclosure