Reports until 16:30, Thursday 18 April 2013
LHO General
patrick.thomas@LIGO.ORG - posted 16:30, Thursday 18 April 2013 (6122)
Ops summary
Apollo disassembling the clean room over BSC6, recurrent ADC overflows on H1IOPSEIB6, large motion on suspensions
Sheila transitioned the LVEA to laser safe
Filiberto pulling cables to HAM5
Jodi, Mitchel, moving soft covers on the doors of HAM2 to prevent interference with ISI
9:39 Dave restarted the DAQ to remove h1ecatc1 channels from the EDCU
2 take cover drill phone messages from Hanford
Dave working on alarm settings
Sheila transitioned the LVEA to laser hazard
12:45 Cheryl starting work in HAM2,3, flashing MC, checking beam paths. Soft covers eventually removed from both HAM2 and HAM3 due to interference with ISI
Washington Crane onsite for crane inspection
2:28 Vacuuming at end X begins sets off dust counter
3:27 Michael R., Pablo going into H2 PSL enclosure to work on PCAL
Door removed from BSC6 to remove items in preparation for vacuum pumpdown. Kyle to start pump, but not attach it to the chamber yet.