Final BSC2 alignments were completed and IAS equipment removed from the spool area on Wednesday, April 17th.  The final alignment errors for the BS are as follows:
	- 
		Longitudinal: -0.4 mm (South, -X)
		
	
 
	- 
		Lateral: +0.1 mm (West, +Y)
		
	
 
	- 
		Vertical: +0.4 mm (high, +Z)
		
	
 
	- 
		Pitch: 7 µrad down
		
	
 
	- 
		Yaw: 52 µrad CCW
		
	
 
	The ITMy elliptical baffle was also aligned in lateral and vertical position.  Its final aligment errors are:
	- 
		Lateral: +2.2 mm (North, +X)
		
	
 
	- 
		Vertical: -2.4 mm (low, -Z)
		
	
 