0800-1100 Apollo installing spool between HAM3/BSC2
0900 - Keita transitioned LVEA to laser hazard
0944 - Keita was able to flash the mode cleaner and transitioned LVEA back to laser safe
1000-1600 Michael R and Craig C working in H2 PSL enclosure
1054 Mark B taking quick spectra on PRM----ok with Apollo flanging next door at HAM 3
1230 Dave B updating and restarting PSL user models and DAQ
1528 Cheryl accidentally tripped and reset PRM watchdogs, which then tripped HAM2-ISI. Justin and Jim attempted to reset the ISI watchdog, the user DACKILL and the IOP DACKILL. We were apparently successful.