Reports until 16:06, Wednesday 24 April 2013
LHO General
justin.bergman@LIGO.ORG - posted 16:06, Wednesday 24 April 2013 (6195)
ops shift

0800-1100 Apollo installing spool between HAM3/BSC2

0900 - Keita transitioned LVEA to laser hazard

0944 - Keita was able to flash the mode cleaner and transitioned LVEA back to laser safe

1000-1600 Michael R and Craig C working in H2 PSL enclosure

1054 Mark B taking quick spectra on PRM----ok with Apollo flanging next door at HAM 3

1230 Dave B updating and restarting PSL user models and DAQ

1528 Cheryl accidentally tripped and reset PRM watchdogs, which then tripped HAM2-ISI. Justin and Jim attempted to reset the ISI watchdog, the user DACKILL and the IOP DACKILL. We were apparently successful.