Reports until 19:46, Wednesday 01 May 2013
LHO General
patrick.thomas@LIGO.ORG - posted 19:46, Wednesday 01 May 2013 (6235)
Ops summary
Apollo drilling at end Y for BSC test stand. Moved vacuum outside to mitigate high dust counts.
Mount lock and key on site
Fire department truck on site
FMCS reverse osmosis alarm
end Y transitioned to laser hazard
Filiberto replaced a seismic capacitive position sensor at BSC6.
Richard rebooted the front end systems at end Y
Kyle to connect a turbo pump/pump cart to a closed 8" gate valve on the HAM3 east door.