John W. and I took more measurements on the main crane rails, will continue tomorrow with additional measurements. All holes were drilled for test stand at End X and started assembly of pedestals. Scott and Randy took some measuerments on BSC 10 support tubes, and moved some HEPI fluid to End X for Hugh.