H1 CDS (PEM)
david.barker@LIGO.ORG - posted 09:13, Saturday 15 August 2026 (91557)
PEM ACC labeling and reconnected EX ACC OPLEV

Miranda, Dave:

Friday afternoon we updated the cable labeling for the ACC BNC coax cables at EX, MX and MY. EY cables were already complete.

At EX we reconnected the BNC for H1:PEM-EX_ACC_OPLEV_ETMX_Y_DQ which we had found to be disconnected. Plot shows it had a signal until the 23rd June of this year.

 

Images attached to this report
H1 CDS (DetChar, PEM)
david.barker@LIGO.ORG - posted 08:57, Friday 14 August 2026 - last comment - 09:39, Friday 21 August 2026(91537)
Corner Station PEM Accelerometer mismatch identified and fixed

Miranda, Dave:

Over the past week we have documented the LHO PEM accelerometers and produced an as-built  wiring drawing

This was in response to a possible misreading of accelerometer(s) with the wrong channel names.

We found three accelerometers with incorrect names, which date back to pre-O4, so I'm tagging DETCHAR.

The accelerometer Was being readout as this channel
H1:PEM-CS_ACC_LVEAFLOOR_HAM6_Z_DQ H1:PEM-CS_ACC_BEAMTUBE_SRTUBE_X_DQ
H1:PEM-CS_ACC_BEAMTUBE_SRTUBE_X_DQ H1:PEM-CS_ACC_EBAY_FLOOR_Z_DQ
H1:PEM-CS_ACC_EBAY_FLOOR_Z_DQ H1:PEM-CS_ACC_LVEAFLOOR_HAM6_Z_DQ

We fixed this at 16:00 Thursday 13th August 2026 PDT by remapping the BNC connections on the front panel of APC1. The cable going to port12 was moved to port13, that going to port13 was moved to port14 and that going to port14 was moved to port12.

We tap-tested the EBAY_FLOOR accelerometer at 16:10 and this showed up on H1:PEM-CS_ACC_EBAY_FLOOR_Z_DQ

Comments related to this report
mirandarose.claypool@LIGO.ORG - 09:39, Friday 21 August 2026 (91637)CDS, DetChar, PEM

For detchar: Based on our (dave, robert, my) best guesses, this error starts on JAN 26th 2024 when the ENdevcos, as well as the signal conditioners for the accelerometers, were replaced (alog 75592). This is post end of O4a (Jan 16th 2024), so the data for O4a is okay, but the data for O4b/c is affected. This means that if there's an hveto round winner/trigger/pemcheck correlation/etc for one of the three channels on the right, it will instead be data from the detector on the left column. For clarity:

  • If the trigger says H1:PEM-CS_ACC_BEAMTUBE_SRTUBE_X_DQ, then the data is actually from the lvea floor accelerometer, H1:PEM-CS_ACC_LVEAFLOOR_HAM6_Z_DQ.
  • If the trigger says H1:PEM-CS_ACC_EBAY_FLOOR_Z_DQ, then the data is actually from the beamtube accelerometer, H1:PEM-CS_ACC_BEAMTUBE_SRTUBE_X_DQ.
  • if the trigger says H1:PEM-CS_ACC_LVEAFLOOR_HAM6_Z_DQ, then the data is actually from ebay accelerometer, H1:PEM-CS_ACC_EBAY_FLOOR_Z_DQ.

Here are some examples that I hope help clarify (as I was also confused):

  • When Dave and I tapped the ebay floor accelerometer with a pen, there was a spike on the ham6 floor accelerometer channel. So, H1:PEM-CS_ACC_LVEAFLOOR_HAM6_Z_DQ was incorrectly reading data from the ebay floor accelerometer and not the lvea floor accelerometer. 
  • Likewise, when Robert unplugged the srtube accelerometer, the ebay floor z channel disappeared. So, the H1:PEM-CS_ACC_EBAY_FLOOR_Z_DQ channel was receiving information from the srtube accelerometer.
  •  I've also attached spectra that shows a few days before and after the switch, Jan 25th and Jan 29th, 2024. You can see the channel names change for the different spectra while retaining the same shape.
Images attached to this comment
H1 CDS
david.barker@LIGO.ORG - posted 07:06, Tuesday 28 July 2026 - last comment - 09:04, Tuesday 28 July 2026(91278)
State of the front end models before the RCG upgrade

Pending Filter Files:

h1calcs had a modified filter file waiting to the loaded. The running filter file was last loaded 16jul2026, H1CALCS.txt was modified at 10:52 27jul2026 and not loaded. I made a local copy of the modified file, then removed the changes by doing a subversion revert. This cleared the CFC flag on h1calcs.

SDF Diffs:

Several models have outstanding SDF diffs (screen shots attached below)

model num diffs
susmc2 2
susam 8
susomcab 6
susom1ab 16
susom2ab 8
susom3ab 16
isibs 11
isiham3 1
isiham7 54
calinj 1
calex 1

 

Images attached to this report
Comments related to this report
anthony.sanchez@LIGO.ORG - 09:04, Tuesday 28 July 2026 (91286)

Got some screen shots of a few different SDF Diffs. 

I took these screenshots after Corey had already taken the SUS to SAFE state.
Also the LASER Stop button had already been pressed. 

Images attached to this comment
thomas.shaffer@LIGO.ORG - 08:55, Tuesday 28 July 2026 (91283)IOO, OpsInfo, PEM, SUS

From what I can tell, I think we are mostly in a good spot for SDFs. The few items to note:

  • JAC-PZT_WHITEN_SET_2 - spekaing with Sheila the current config matches the dewhitening so we accepted it.
  • There are channels not initialized on PEMCS, SUSFC2, IOPSUSB123, SUSAUXH34. Nothing was done about these

The two SDF screens we have are out of date. There have been many models added or names changed that we have not kept up with, and made this a bit harder. We will update these asap.

Images attached to this comment
H1 SUS (PEM, SEI, SPI)
thomas.shaffer@LIGO.ORG - posted 14:50, Tuesday 07 July 2026 (90927)
2026 B&K Summary

Links to all of the B&K'ing that has happened this year to wrap up the vent. List is in reverse cronilogical order.

Task Alog Link
HAM3 SLiC table 90908
PR2 90906
MC2 90905
HAM3 CRS 90903
ITMX 90857
BBSS 90843
HAM3 SPI ISIK 90571
ITMY 90512
HAM2 SPI ISIJ 90510
POP Periscope 88830

 

H1 PEM (PEM)
ibrahim.abouelfettouh@LIGO.ORG - posted 18:45, Thursday 28 May 2026 (90375)
Dust: Dust Monitor 10 on the rise

Just noticed DM 10 has been steadly going up for last 6 hours. So has the wind - could be an unpropped door? Just adding it here for log. Screenshot attached.

 

Images attached to this report
H1 General
oli.patane@LIGO.ORG - posted 16:37, Tuesday 26 May 2026 - last comment - 10:01, Wednesday 27 May 2026(90347)
Ops DAY Shift End

TITLE: 05/26 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Work continued today in HAM2 and currently there is still work going on at the test stand on the BBSS.

The LVEA is currently LASER SAFE


LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:30 FAC Kim LVEA n Tech clean 16:04
14:45 SUS Betsy LVEA n BBSS work 16:23
14:52 FIT Patrick XARM n Leisurely strolling 15:50
15:08   Richard LVEA n Catching Betsy 15:21
16:05 SUS Ibrahim LVEA n BBSS work 16:23
16:05 TCS Camilla JOAT Lab n CHETA work 17:14
16:05   Keita LVEA n Talking to Betsy 16:23
16:13 IAS Jason, RyanC LVEA YES FAROing BBSS 18:06
16:16 VAC Travis LVEA n Checking on pumps 16:27
16:50 FAC Chris, pest guy LVEA YES Spraying the little guys 17:04
16:56 ISC Keita, Rahul LVEA YES ISS Array work 18:52
17:06 SPI Marc, Josh LVEA YES SPI cabling (Marc out 17:10) 17:50
17:17 FAC Eric Fire pump room n Testing fire pumps 17:48
17:22 ISC Elenna LVEA YES ISS work 18:51
16:50 FAC Chris, pest guy LVEA YES Spraying the little guys 17:04
17:58 SPI Josh LVEA, MER n SPI cabling 23:34
18:00 FAC Kim FCES N Technical Cleaning 18:41
18:36   Corey OpticsLab n   19:22
19:03 HAZ Keita LVEA YES Transitioning LVEA back to laser SAFE 19:09
19:53 SUS Betsy LVEA n BBSS work ongoing
20:09 IAS Jason, RyanC LVEA n FAROing BBSS ongoing
20:26 SPI Jeff OpticsLab y(local) SPI work ongoing
20:39 CRS Shoshana, Jim H2 PSL n CRS build 22:07
20:42 EE Fil LVEA n Grabbing measurements by TCS racks 23:28
20:54 SUS Ibrahim LVEA n BBSS work ongoing
21:02   Camilla OpticsLab y(local) Bringing beam scanner to Jeff 21:21
21:28 VAC Gerardo LVEA n Checking out roasting HAMs 21:46
22:31 CRS Shoshana H2 PSL n CRS work ongoing
Comments related to this report
betsy.weaver@LIGO.ORG - 10:01, Wednesday 27 May 2026 (90354)

Late alog:  Yesterday we flipped on the HAM567 Mega cleanroom fans to get the room cleaned up in prep for opening HAM7.  This likley is raising the temp in that zone.  Sheila is aware that this may effect suspensions.

ryan.crouch@LIGO.ORG - 17:34, Tuesday 26 May 2026 (90348)PEM

ZONE4's temperature has increased by almost 2 degrees since 21:00 UTC (2pm PDT).

Images attached to this comment
H1 SPI (CDS, ISC, SEI, SPI)
jeffrey.kissel@LIGO.ORG - posted 14:50, Wednesday 06 May 2026 - last comment - 11:22, Wednesday 13 May 2026(90139)
First In-vac Components for SPI Pathfinder Installed!! ISI HAM2 (ISIJ) Reflector Assembly Installed and Cabled up to Feedthrus
J. Kissel, J. Warner
ECR: E2400026
WPs: 13237, LHO:13238
Final Design Doc: T2400145
Relevant Systems Level Drawings:
    . Mechanical Assemblies
        :: ISIJ Reflector D2400102
        :: HAM Table Baffles D1700335
        :: HAM2 Systems Layout D0901083 (not yet-inclusive-of-SPI)
    . Electronics Wiring Diagram 
    . Cable Routing In-vac Cable Routing Plan from G2401479 (pages )
    . Flange Layout D1002873-v11

Executive summary:
    - Removed ISIJ +X-side, center, HAM2 ISI table baffle from D1700265-v4 Type 2 
        :: Bracket mounting bolts left screwed into ISI optical table for this will eventually become a D1700265-v4 Type 3 and remounted.
    - Installed ISIJ Reflector + QPD Assembly D2400102 on +X ISI side wall (D071057-v2), with its shroud (D2500030) in place
        :: We didn't weigh it, but the SW Assembly predicts a mass of 1.96 [kg], which we can likely round up to 2.0 [kg] with the shroud installed.
    - Routed and connected QPD read-out cable system to D3 flange, F10 spigot.
    - Routed and connected picomotor cable system to existing D1101515 quadrupus leg Cable #3, J4 
        :: Cable #4, J5 is connected to IO PM5 mirror, Cables #2 J3 and #1 J2 were reset in neat coil with connectors floating to avoid electrical grounding as before.
    - Nudged make-shift baffle system using D1700261 ballast mass baffle mounted vertically on the +X / +Y / Beam Height corner of the chamber wall upon entry into beamtube.
        :: the will DEFINITELY need a technically-minded reset.

In at 10:30a PT and out by 12:30a PT. It's so lovely when everything goes to plan!

Pictures and further info to follow in the comments below.
Images attached to this report
Comments related to this report
jeffrey.kissel@LIGO.ORG - 14:56, Wednesday 06 May 2026 (90140)
Removing Center ISI Table Baffle

Not much to say more here -- removal was easy. We tried "just" removing the panel using the the coated/capped screws, but these didn't budget upon several attempts with Jim's fingers and grunts. So, elected to fight that battle outside the chamber and removed the whole assembly at the table mounting point.

The full assembly is wrapped in dry-wipes, foil, and ameristat bagged and in Mitch's office while it waits for the Type 03 version of the panel to come out of clean-n-bake.
Images attached to this comment
jeffrey.kissel@LIGO.ORG - 15:01, Wednesday 06 May 2026 (90141)
Installation of ISIJ Reflector itself

Also not much to say, other than the great joy that the drawings of the D071057-v2 ISI Side Wall have the irregular positions of the 1/4-20 utility holes accurate enough that Bram's CAD-informed-only mounting holes for the ISIJ reflector's baseplate of the reflector lined up without issue. *phew*

Also -- the D2400102 drawing doesn't highlight which length 1/4-20 bolt should be used for mounting, so we used 1/4"-20 x 0.625"L (5/8"), which was "just enough."

Pictures from the main entry are the best "big picture" views, but here I attach a few more in case the need arises.
Images attached to this comment
jeffrey.kissel@LIGO.ORG - 15:14, Wednesday 06 May 2026 (90142)
QPD Cable Routing

We didn't get dedicated pictures of this QPD cable routing but,
    - it follows the plan on page 22 of In-vac Cable Routing Plan posted to G2401479-v3,
    - You can see the ST1 portion of it well-enough in the above pictures,
    - Jim did the routing, so I trust that there's a healthy loop in the jump from ST1 to ST0, and
    - I attach a picture here of the record that we've connected it to D3-F10, and a copy of the "F-Type" (D2000225-v1) counting from page 18 of the above mentioned cable routing plan.
Images attached to this comment
jeffrey.kissel@LIGO.ORG - 15:19, Wednesday 06 May 2026 (90143)
Picomotor Cable Routing BEFORE INSTALL

Just because we knew little about the details of this cable system ahead of time given how ancient the PM5 picomotor actuated mirror system, I got a lot of good "before" pictures. Mostly, I confirm that PM5 does use the Cable #4 J5 leg of the D1101515 quadrupus, and all the other legs were neatly cable-tied up and away.

 
Images attached to this comment
jeffrey.kissel@LIGO.ORG - 15:27, Wednesday 06 May 2026 (90144)
Picomotor Cable Routing AFTER INSTALL

Here're photos of the routing of the two 72 [in] length D2400316 picomotor extension cables connected in series and routed to all the way around from the ISIJ reflector on the +X face to the -X / +Y corner of the table where CB-9 and the D1101515 quadrupus lives. 

I paid particular attention to the connectors and made sure they were left floating and not shorting to anything metal.

I also re-bundled up Cable #2 J3 and Cable #1 J2 in coil similar to the before pictures, again ensuring that the connectors are floating in both space and electrical connection.
Images attached to this comment
jeffrey.kissel@LIGO.ORG - 15:29, Wednesday 06 May 2026 (90145)INJ, PEM
The Nudged Chamber Wall Baffle

Some pictures of the baffle that we nudged that will likely need re-alignment.
Images attached to this comment
corey.gray@LIGO.ORG - 10:28, Friday 08 May 2026 (90175)EPO

tagging for photos.

jeffrey.kissel@LIGO.ORG - 12:08, Tuesday 12 May 2026 (90212)
On the new channel assignment of HAM2's SPI ISIJ picomotor, and why I'm confident it's CH7:

Per D1000581-v13, page 13 and then D1900511-v12 page 17, I'm quite confident that the quadrupus cable and up in CH5-8 of the controller on IOT2L, called "PICOMOTOR 5" in D1900511, which I guess becomes "Picomotor B / Slot 2" on page 2 of the ECAT System Diagram D1100683-v11. 

This is corroborated with opening up the picomotor MEDM screen -- sitemap > LSC > picomotors > "HAM 2 + oplev" button (that has "controller 5" and "PICO B" next to it), and clicking through the channels and seeing that CH8 is called "PSL ISS QPD/PD (PM5)."

Here's a labeled picture that makes things more clear.
Images attached to this comment
jeffrey.kissel@LIGO.ORG - 11:22, Wednesday 13 May 2026 (90230)
Belated aLOG on in-vac cable routing of the ISIJ QPD A PD and serial number assignments:

Path       PD Name    PD SN          Monopus            D9-to-D25 Monopus
                      |----------D2600002--------|
                      D1600083 Type 3     D2400340      D2300128
OL ISIJ    QPD A      S2401092            S2500517      S2500511


Images attached to this comment
LHO FMCS (PEM)
anthony.sanchez@LIGO.ORG - posted 16:11, Wednesday 29 April 2026 (90059)
Vibration Sensors To Gauge Health Of HVAC Fans Site Wide

FAMIS 39862 Vibration Sensors To Gauge Health Of HVAC Fans Site Wide
 

Images attached to this report
H1 PEM (DetChar, PEM)
samantha.callos@LIGO.ORG - posted 17:10, Thursday 16 April 2026 (89929)
PEM November 2025 Injection Coupling Analysis Complete

Samantha Callos, Genevieve Connolly, Robert Schofield, Ryan Short, Carlos Campos

The detchar presentation summarizing the injection analysis can be found on the DCC at: https://dcc.ligo.org/LIGO-G2600768

A PDF of this report has also been attached to this alog along with a spreadsheet of the injections.

Non-image files attached to this report
H1 General (CAL, ISC, PEM, SUS)
anthony.sanchez@LIGO.ORG - posted 17:13, Monday 13 April 2026 (89876)
Ops Monday Morning report

TITLE: 04/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Iluminators for HAM3 BSC1 and 2 are now on.
HEPI and ISI for BSC2 is locked out. tagging PEM. and there is now a Red H1:SYS-ETHERCAT_DEVICE_1_SLAVECOUNTACTUAL due to the iluminator Chassis device that Fil turned on between BSC1 and BSC1 in the beergarden to allow the illuminators to turn on. tagging CDS. 

PCAL troubleshooting: 
Dripta and I were trying to take FFT's of PCAL Lines for more Power budget work and we noticed that the PCAL Y laser is off with no current on H1:CAL-PCALY_LASERDIODECURRENT. I trended the channel back and compared it with some channels that I thought may link it to the IOP restarts. 
Dripta went to EY to toggle the Laser power rocker switch just in case it was just a simple issue of a turn it off and back on again.  Tagging CDS again.

I noticed that MC1 & 3 were saturating. 
IMC H1:IMC-WFS_GAIN was set to 0 and the history was cleared to solve the problem of MC1 & MC3 were being saturated.
Trending some channels that were suspected to perhaps  be the cause of the junk signal and thus the cause of the saturations.
The IMC ASC has it's own block to do power normalization, different from the LSC power normalization. The output of this block is "INNORM" used to normalize MC2 NSUM for the IMC WFS triggering.
Relavent FRS ticket: 
https://services1.ligo-la.caltech.edu/FRS/show_bug.cgi?id=9387

More IOP model restarts happening again for HAMS 7,8 then HAM 5,6, & BSCs 1,2, & 3.
Please see the attached SDF Diffs for HAMs 5, 6 and the BS: 
SUSSR3
SUSRM
SUSIFOOUT
SUSSQZOUT
SUSBS (my bad I had sort on substring selected with an old Optical Align string in the search field.)
All SDFs were accepted before the IOP restart. 
ITMS  IOPs have not been rebooted yet. Tagging SUS, SQZ & ISC

MC2_trans Beam Dump twas Twissled today, then put back into original place. 

The ITMs had their IOP's restarted after a time cable swap today as well.
All SUS were turned back to Aligned.
SEI for HAM 2,3,4  and BSC 1 & 2 still have their HEPI's and or their ISI's WD tripped or other wise in a ISI Damped Hepi offline state.

As you can see from this ITMY trend, Jim went inside to lock the ISI and tripped the ISI, then Jason went in and tripped it again, then there was an IOP restart. 

A slightly less exciting trend of ITMX.


LOG:
 

Start Time System Name Location Lazer_Haz Task Time End
14:47 FAC Randy LVEA n Prep for dome removal and other moves 16:06
15:09 FAC Kim, Nelly LVEA n Tech clean - HAM3, Biergarten 16:07
15:47 FAC Randy LVEA BSC2 N Working on removing BSC2 Dome 16:06
16:07 VAC Randy MID Y N Picking up matieral 17:53
16:09 FAC Nellie Mid & End Y N Technical cleaning & Resupply 18:09
16:13 SEI Jim & Ibrahim LVEA BeerGarden N Locking Hepi , ISI on BSC2 18:05
16:26 FAC Kim LVEA Output Arm N Technical Cleaning & Resupply 17:40
16:33 CBEX Tyler's C&E Trentching Mid Y N trenching for CBEX Building 02:33
16:41 VAC Gerardo LVEA BSC2 N Removing Vac Equipment from BSC2 dome 18:10
16:43 IAS Jason LVEA N Warming up the FARO system 17:13
17:25 CHETA Camilla Optics Lab n Grabbing optics. 18:26
17:36 VAC Jordan LVEA BSC2 N Helping Gerado 18:10
17:38 EE Fil & Corey LVEA N Setting up cameras and turning on Illuminators 19:38
18:11 PCAL Dripta & Disha EY N Power Cycling PCAL laser 19:02
18:29 IAS Jason & Crouch LVEA HAM3 to BSC1&2 N FARO surveying HAM3 & BSCs 19:57
19:37 IAS Ibrahim LVEA BeerGarden N DeBaffling 19:53
19:41 VAC Randy LVEA BeerGarden N BSC2 Dome removal prep 20:02
19:51 EE Marc & Erik HAM Shaq & HAM7 N Swapping power supply Power cables inside chassis 20:23
19:58 PEM TJ EX N Checking Dust Mon Pump 20:29
20:30 TCS Camilla & Maddi , TJ EX Yes Hartman troubleshooting &work 22:05
21:01 IAS Jason & Ryan, Jim, Ibrahim LVEA HAM3, BSC1&2 N Faro work inside the Vac chambers 00:05
21:43 VAC Gerardo & Jordan LVEA HAM1 N taking parts off of HAM1 22:38
22:12 IAS Sheila LVEA Ham3 N Helping with Faro work 22:38
23:19 IAS TJ Optics Lab & LVEA N looking for a Class B Ruler in mm. 23:49
Images attached to this report
LHO VE (EPO, PEM, VE)
corey.gray@LIGO.ORG - posted 16:15, Thursday 09 April 2026 - last comment - 17:35, Friday 10 April 2026(89849)
BSC1 +Y Door Bolts Removed + BSC2 Dome Bolts Removed, BUT Had One Galled Dome Bolt!

(Jordan V, Corey G)

In prep for upcoming BBSS Install, "broke" bolts (which is slang for loosened them) on:

BSC1's +Y Door Bolts (mostly) Removed & Accelerometer Cable Disconnected

BSC1's door had all bolts but (4) removed.  Sadly, I removed the bottom (easy ones) bolts first and then when I got to the top bolts they were very hard to loosen because of some sag.  Additionally, their access is horrible with:  a stiffening plate for the chamber right above the rear access to these bolts, then there are cable trays also in the way, and the C3 fabric cover is draped in your face the whole time.  Jordan helped out and we were able to get the last top bolt removed.  We also loosened the (4) bolts 1-turn which is the typical procedure.

There was an accelerometer still cabled up to this door.  I disconnected the cable (labeled "PEM:BSC1_ACC_X") and stuffed the cable into the cable tray above this door.

Time lapse of me removing half the bolts in this LINK (since we only files allowed in alog have to be smaller than 15Mb.)  :(

BSC2's Dome Bolts (mostly) Removed, But Have A Galled Bolt!

BSC2's dome bolts were removed.  4-bolts were left in place (they were loosened and then tightened up a little).  One notable, is there is 1-galled dome bolt.  Jordan and I used the long wrenches to see if we could use more force to help it break loose, but no luck.  We did not try pouring some alcohol on the bolt to help as a lubricant.  The bolt is loose and has about 1-2mm of a gap on it.  So, the pros could try use even longer cheater bars, a saw cutter, or they were also chatting about a tool to cut the nut off.  At any rate, 

Images attached to this report
Comments related to this report
gerardo.moreno@LIGO.ORG - 17:35, Friday 10 April 2026 (89864)VE

(Travis S., Gerardo M.)

Travis brought his portable reciprocating saw and a couple of new blades, this little saw did the job, we were able to make a couple of cuts then used the big wrenches to break the bolt off.  Galled bolt is off!

Images attached to this comment
H1 General (CAL, CDS, PEM, TCS)
anthony.sanchez@LIGO.ORG - posted 17:25, Wednesday 08 April 2026 (89824)
Wednesday OPS Ending report

TITLE: 04/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Vacuum team has been Venting the corner station still. 

OMC's were taken to SAFE for a model reboot then taken back to aligned.

Dave and Marc  swapped some cables and restarted the following IOP's & models today. Please check your SDF's haven't been reverted.

H1IOPOMC0 
H1IOPOAF0 
H1IOPASC0
Tagging teams that may have SDF issues in the future.

SRM taken to aligned. (I have no idea Why it was misaligned.)

IMC Input Power Channel is no longer "Cray Cray" and is now reading correclty as of Jennie D's alog.

Restart ISI models BSC 1,2, & 3 
FW1 Down 19:15 UTC
DC0 down 19:20 UTC 
DC0 Re-established at 20:36 UTC  

ISI BS Stage 1&2 watchdog tripped 20:36 Likely due to Vac activities. 
ISI HAM3 WD tripped 23:33

VAC team says BSC2 annulus is vented & Dome bolts ready to be broken. 
 

LOG:

 

Start Time System Name Location Lazer_Haz Task Time End
18:00 FAC Chris H2 N clearing the tumbleweeds @ H2 21:01
19:40 SUS Elenna & Madi Optics Lab Y aligning optics on BHSS Elenna out first 22:39
20:01 EE Fil CER N Rack cabling 23:08
20:04 SUS Oli & Maddie Optics lab Y BHSS optic alignment 23:02
20:29 SUS Jeff CER, LVEA N Take pictures of racks, R3 by HAM3 in LVEA 20:46
20:53 PSL Jason MER N Filling spare PSL chiller 21:40
21:19 SUS Ibrahim, Travis LVEA N Checking ergo arm 21:28
21:23 PSL RyanS MER N Help Jason with the chiller 21:40
21:45 FAC Richard CER N Talk to Fil 22:00
22:16 VAC Jordan, Gerardo, Travis LVEA N Vent anulus ion pump in @ 1502 23:58
LHO General
corey.gray@LIGO.ORG - posted 07:43, Tuesday 07 April 2026 - last comment - 07:51, Tuesday 07 April 2026(89800)
Tues DAY Ops Transition

TITLE: 04/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 5mph Gusts, 3mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.15 μm/s 
QUICK SUMMARY:

Things on the menu for today, HAM1's +y door, venting the corner, and a lot of prep (HAM3 doors should also be coming off this week & more prep for BBSS work!). 

h1seih7 is still down (so HAM7 SEI & SUS systems are all red). 

The Ops Overview also continues to have "IMC INPUT POWER" flashing from 0-200W (but I was assured this was not real and purely a calculation error; light pipes have been closed since last Fri morning).

OPS Note:  I will leave the con around 1045amPDT for a tour and then to attend a BBSS preparation meeting at 1pm PDT and RyanC has graciously offered to cover for me.

Comments related to this report
corey.gray@LIGO.ORG - 07:51, Tuesday 07 April 2026 (89801)PEM

Ran the dust monitor check and LAB2 has  error (known issue) and all else looks good.

H1 CDS (PEM)
jonathan.hanks@LIGO.ORG - posted 17:24, Wednesday 01 April 2026 (89744)
WP 13137 Testing running the MX weather station IOC in a container

To test out new infrastructure for running IOCs and other services in CDS I put the MX weather station into a podman container and started it on our new service-host cluster (a high availbility cluster for services).

As part of this I created a generic container that should work for the other weather stations and the dust monitors (until those are migrated to beckhoff).

This work is part of an effort to improve our infrastructure, including how we track, monitor, and manage our IOCs.  There should not be any user visible change with this, other than the IP address that the IOC responds from is different.

Notes:

 * We run these older IOCs in the background with screen as they are iocsh shells and want a terminal.  For this setup I no longer need to run with screen, we just tell the container system (podman) to run the container with a tty in interactive mode in the background.

 

 

 

LHO FMCS (PEM)
corey.gray@LIGO.ORG - posted 09:11, Wednesday 01 April 2026 (89728)
HVAC Fan Vibrometers FAMIS Check (FAMIS 39861)

For FAMIS #39861: Fans look mostly flat (Corner's FAN5 looks faintly noisier the last 1.5 days).

Images attached to this report
LHO FMCS (PEM)
ryan.crouch@LIGO.ORG - posted 12:01, Monday 30 March 2026 (89699)
HVAC Fan Vibrometers FAMIS Check (FAMIS 39860)

Closes FAMIS39860, last checked in alog89375

Everything looks as it did during the last check, except MR_FAN4_170_1 looks noisier than during the last check.

Images attached to this report
H1 PEM (PEM)
corey.gray@LIGO.ORG - posted 13:06, Monday 23 March 2026 - last comment - 10:11, Tuesday 24 March 2026(89605)
3-month Trend of Dust Counts At BSC2

Betsy wanted a look at the last few months of dust trends for BSC2.

(This is Dust Monitor LVEA10 which was moved to BSC2 in Feb [alog89137].)

Images attached to this report
Comments related to this report
betsy.weaver@LIGO.ORG - 10:11, Tuesday 24 March 2026 (89617)
Calum and I looked over this plot - the counts are not too bad during the many periods of nearby craning and other activity.  The platform and dome have not yet been cleaned.  I confirmed that the cross flow tent has positive pressure so Calum and I are comfortable with this new "cleanroom" configuration.
LHO General (PEM)
corey.gray@LIGO.ORG - posted 08:15, Thursday 05 March 2026 (89375)
HVAC Fan Vibrometers FAMIS Check (FAMIS 39857)

For FAMIS #39857: All fan trends look nice and flat.

Images attached to this report
LHO FMCS (PEM)
oli.patane@LIGO.ORG - posted 09:31, Friday 27 February 2026 (89300)
HVAC Fan Vibrometers Check FAMIS

Closes FAMIS#39856, last checked 89201

Corner Station Fans (attachment1)
- All fans are looking normal and within range.

Outbuilding Fans (attachment2)
- All fans are looking normal and are within range.

Images attached to this report