TITLE: 04/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: Lots of good commissioning work done today, surveying training in W-bay LVEA
LOG:
- 14:24 - 15:13 Randy, Chuy into LVEA - N-bay craning
- 14:41 - 16:59 Karen into LVEA- Technical Cleaning
- 15:00 - 15:43 Kim into LVEA - Technical Cleaning
- 15:00 - 19:20 Tyler into LVEA with Farro - W-bay surveying
- 15:35 -19:20 Jim, Jason into LVEA with Farro - W-bay surveying
- 15:48 - 16:51 Austin into EX - Phone networking tests
- 18:24 - 18:34 Tyler craning in W-bay
- 18:27 - 20:00 Gerardo into LVEA - HAM7 RGA
- 20:18 - ???? Tyler, Jim, Jason into LVEA with Farro - W-bay surveying
- 21:00 Jenne was moving spot position on ITMX which maybe will effect violins.
- Saw nothing bad in ITMX violins
- ITMY mode 5 and 6 were slowing increasing. Ryan changed gains to +0.03 for ITMY mode5 and +0.2 for ITMY mode6. We didn't keep this on long enough to test so will not change any code. They will come back as nominal (-0.03 for mode5 0 for mode6).
- 21:30 - 22:11 Richard into LVEA
- 21:51 - 22:23 Betsy into LVEA - W-bay
- 22:49 - ???? Austin into EY - Phone networking tests
Still out: Austin at EY, Farro team in LVEA W-bay
23:14 Austin is back form EY