930-1600 Michael R and Oliver P working in H1 PSL enclosure all day. The high power oscillator is enabled and beam is currently being dumped on the PSL table 1000 Thomas working on OpLev near HAM 3 1005 Arnaud running excitation on BS (BSC2) 1030 Filiberto and Aaron dressing cables at HAM2 1315 Pablo working on photon calibrator in H2 PSL enclosure 1400 Cheryl and Joe inspecting 1064 input viewport on HAM 1 (WP#3859) 1450 DAQ restart by Dave B 1516 Tyler working with Cheryl on modification for IOT2L