Apollo work for 08 May 2013
-Moved the Genie snorkel lift from High Bay to LVEA so that the LVEA camera could be cleaned for Richard and then moved the Genie back to High Bay so it could be inspected by Mid-Columbia. 
-X End work continued. Test stand cleanroom was rolled out of the VEA to the middle bay so that picking eyes could be fitted and attached. The picking eyes, taken from the "dirty room", required a slight modification before they could be attached. Holes were drilled in the cleanroom frame and the eyes were attached this afternoon. The table that sits on top of the TMS Bosch frame was moved into the lab to clear space in receiving. Work to clear interferences for IAS table placement is on-going.
-Provided support for OpLev work: Mick worked with Thomas and Tyler fabbed a cover for an OpLev camera.
-Provided support to SEI.