Reports until 16:20, Friday 10 May 2013
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:20, Friday 10 May 2013 (6336)
Operators Log

LVEA: Laser Safe

Gerardo and Kyle at working EY VEA
Mike R working in H2-PSL
Cyrus testing cables and install wireless AP at EX
Pablo working with Mike R. in H1-PSL. They are switching in and out of Laser Hazard inside the H1-PSL
Gerardo and Kyle working on GV-5
Hugh and Greg working on HEPI on BSC1 and BCS2
Jax at EY gathering up circuit boards for modifications
Apollo working on Op-Lev Pier anchors at EY
Mike R working in H1-PSL
Dave & Jim replacing pump controller at EY
16:04 Shelia transition EY to Laser Hazard