MitchR, JimW
After several furious hours of helicoiling, forklifting, placing bolts and torquing, the last 2 large plates for the first (formerly-known-as-H2) I1 BSC ISI were added to the assembly today. Next up, everything else: pods, actuators, cps's... Potentially, we could be testing sometime next week.