Apollo crew moved BSC Repair Arm, HAM Install Arm, 5-axis Table, and other install tooling to the south side of the beamtube between HAM10-11. Christina wiped down the BSC3 ISI storage container and the Apollo crew moved the HAM cleanroom over the beamtube and set it down close to the storage container.