H1 INS
jodi.fauver@LIGO.ORG - posted 16:28, Monday 13 May 2013 (6348)
LVEA Clean-up/BSC3 ISI Prep
Apollo crew moved BSC Repair Arm, HAM Install Arm, 5-axis Table, and other install tooling to the south side of the beamtube between HAM10-11. 

Christina wiped down the BSC3 ISI storage container and the Apollo crew moved the HAM cleanroom over the beamtube and set it down close to the storage container.