H1 AOS
corey.gray@LIGO.ORG - posted 16:06, Tuesday 14 May 2013 (6354)
Ops DAY Summary

Day's activities:

PCal work in LEA---going to Laser Hazard (Pablo, Rick, Michael R.)

Weather Station name change work & checked connection at MX(Patrick)

Installing optics on IOT2L (Kiwamu/Chris)

HAM4 work (cleaning chamber/cleanroom, craning items, etc)

Fixing timing issues with LVEA Test Stands (Jim B)

Pulling Cables for ISC

LSC/ASC update to their models (Chris/Kiwamu/Dave)

BSC3 ISI installed on Test Stand

ETMy measurements (Szymon, Fred)

Robert performing beam tube measurements at the end of the shift (Kiwamu is his buddy for the evening)

Maintenance Visitors:  Snow Valley onsite for work on the arms, Paradise, Oxarc filling CP1