PSL Picomotor Cabling

WP 10485

Field cabling for the PSL picomotor have been installed. Control and readback cables were pulled from the PSL Slow Controls Chassis in the CER to the LVEA PSL-R2 rack. New controller and upgraded PSL IO Chassis will be tested later this week.