H2 INS
michael.rodruck@LIGO.ORG - posted 16:44, Friday 18 March 2011 (637)
H2 PSL installation

Grout dams were caulked into place, based off the layout Mick, Nicole and I set yesterday. These are only held into place by a bead of caulk, so take care not to kick them loose. Caution tape was set around the area. On Monday we will cut out the linoleum in the center of the dams and level our table legs.

Images attached to this report