HAM4 ISI Install Prep
The area between HAM4 and the high bay/LEA roll-up door was cleared in preparation for the ISI install.  The BSC ISI storage container was flown from that area to the North Bay.  First cleaning was done on HAM4 and its cleanroom (yesterday). The HAM storage container was moved away from HAM4's north side and the bolts were loosened on the south door. Second cleaning will take place ASAP.
Comments related to this report
jodi.fauver@LIGO.ORG - 15:11, Wednesday 15 May 2013 (6386)
Sorry for the double entry. The submit button stuck...