With the new Sokkia Autolevel, I rechecked the level of the Assembly Test Stand sighting on the Upper Structure base surface which is a referenced flat in the suspension build. (Recall that we re-built the solid stack which the suspension hangs from in order to open up assembly real estate and mount a cross flow HEPA.) On Friday, I determined that the structure was out by 0.008" over a 17" length along the Y direction (perp to beam line of the QUAD). This equates to 0.5mRad. The Test Stand was designed to be level to within 0.2mRad as per T050113, so today I adjusted the Test Stand feet to bring it in to 0.13mRad. A quick check on the beam-line direction which looked better than than 0.13mRad, so no adjustments made for that direction. The BOSEM signals showed a little bit of swing due to this releveling (~100 counts), but no bigger than the daily temperature drift of the signals (where a few degrees soften(?) the blades over the course of the day such that BOSEM LEFT and RIGHT change in the same directions on both chains by ~500 counts).