Now that BSC3 is on the test, we are working on gettting it checked out and connected for testing prior to integration. Today, Fil helped me re-route the in-air cables (because this ISI is sitting 180 from the previous 3 ISI's, so the cables no longer reached the right corners), then Greg helped me ring them out with the emulator, to verify the routing. After that, I powered off the electronics, wired everything up I could (some of the CPS in-air cabling is improperly gendered, requiring adapters I didn't have on hand) and powered everything up. Tomorrow, balancing and lockers, and if we are lucky, TF's over the weekend.