Reports until 07:48, Monday 20 May 2013
H1 INS
jodi.fauver@LIGO.ORG - posted 07:48, Monday 20 May 2013 (6419)
HAM4 ISI Install Prep
This report is for Friday, 17 May.
The Apollo crew spent the morning assembling the A-frames for the ISI install. Hugh and the crew also spent some time going through the Hazard Analysis so that that is out of the way.