Reports until 11:55, Monday 20 May 2013
H1 SEI
greg.grabeel@LIGO.ORG - posted 11:55, Monday 20 May 2013 (6421)
HEPI flushing

HAM 1 is now in flushing. HAM 2 is in operations, HAM 1, 3 and BSC 1, 2, 3 are in flushing. The pressure has been holding steady at 31.5 psi with a motor speed ~1983.

The IPS shift on HAM 1 was:

  Pre flushing     Post Flushing  
  H V   H V
1 392 -3,537   154 -4,018
2 -6,445 -16,215   -6,689 -16,335
3 -3,409 -23,234   -3,640 -23,359
4 -2,846 -1,257   -3,046 -1,385