Reports until 17:46, Monday 20 May 2013
H1 CDS
david.barker@LIGO.ORG - posted 17:46, Monday 20 May 2013 - last comment - 17:48, Monday 20 May 2013(6429)
End station status after fiber cleaning completion.

EY: Vacuum controls signals working. FMCS is connected. The H1 FE-LAN is connected. The Cisco is running which provides HEPI pump controller signals.

There are no other connections at EY, which includes the timing, so no front ends are running correctly.

EX: All Back. Vacuum signals available, not all being trended by EDCU at time of writing. FMCS all back.

We will restore the rest of the EY systems Tuesday morning. Will require restart of front ends and DAQ.

Comments related to this report
david.barker@LIGO.ORG - 17:48, Monday 20 May 2013 (6430)

All PEM DAQ channels look bad at the moment. Will require full system reboot to recover, will be done Tuesday morning.