Reports until 20:44, Monday 21 March 2011
H2 INS
michael.rodruck@LIGO.ORG - posted 20:44, Monday 21 March 2011 (644)
H2 PSL Installation

Linoleum was removed inside the grout dams and table legs were set inside, and leveled. We plan on grouting the legs into place tomorrow with hydrostone.