As this was our next to last ISI install, everything went pretty smoothly. No issues but still a lot of work and pretty much non-stop from 9 to noon. But we got it in and the trolly fixture out by lunch. After lunch we removed and secured all the lifting/trolly pads and the crane debris cover from the table. Lockers are loose; ISI held by shipping braces; 4 bolts in and torqued on each side--remainder will be installed when the shipping braces are removed. Thanks to JimW & Apollo-Zack, Mick, Mark & Bubba A few photos below show why prep is 95% of the job. DaleI had a video camera running, we'll see how that went.