The BSC-ISI models (ITMX, BS, ITMY, ETMY) were modified and recompiled to accommodate the sensor correction path. The test model h1isitst was also recompiled.
The convention for the STS-2s in the seismic model is:
- STS2 - A - Input arm - plugged on BSC1
- STS2 - B - Beer garden - plugged on BSC2
- STS2 - C - Output arm - plugged on BSC3
with A, B, C, the letters used to define the different STS-2s in the simulink models.
At the end stations, STS-2s will be plugged on the B inputs.
The seitst computer (former seib8) was fixed by the CDS group. BSC3 testing on the teststand (without payload) can start.