I disabled the HAM 2 suspensions before Filiberto disconnected, rerouted and reconnected their cables. I forgot MC2 is not in HAM 2 and set one of its watchdog high limits to 0. I reset it. Jim restarted cdsfs0, /ligo was read only. Sheila and Corey worked at end Y aligning the green beam. Vincent yawed HEPI at end Y to assist with the alignment. Sheila installed a camera and Corey marked the IR spot on the ALS table enclosure. Hugh went to end Y and restarted the HEPI pump station servo controller. h1fw0 periodically crashed and restarted. PCAL work was done in the H2 PSL laser enclosure. John took contractors on a tour of the LVEA. Apollo removed the gate valve spool at end X. Corey escorted Mitchel into the Laser Hazard area near HAM 2 to read serial numbers off of the HEPI hardware.