H1 Xend Pcal periscope structure moved to Xend
The pre-aligned H1 Xarm Pcal periscope structure was wrapped (thank you JoeD), transported from the H2 Laser Area Enclosure to the Large Item Access Area, crated, and transported by Apollo to the Xarm receiving area.

On Tuesday, we plan to uncrate it, move it into the VEA, and install it in the A7 adapter.