In order to clear the floor space underneath the cleanroom at the EX spool site (for eventual PCAL and CPB installs), I disconnected PEM components there. The tiltmeter and Guralp seismometer were disconnected, cables labeled, and instruments stored temporarily on the EX termination slab. They reside under their insulating styrofoam coolers. Additionally, the busy mouse latrine that is the tiltmeter granite slab was cleaned with alcohol wipes.