Displaying report 1-1 of 1.
Reports until 07:31, Friday 31 May 2013
H1 ISC
sheila.dwyer@LIGO.ORG - posted 07:31, Friday 31 May 2013 (6555)
Refl beam on iscey
This is a late alog from yesterday morning. Before the gate valve was open I went out to end y to adjust the transmontane position to see if the 10 uW beam on the refl pd was a gobst beam.  With a better alignment of the Trans mon there were:

8.87 mW green power before the EOM, 1.35mW onto the refl PD and -0.220 volts on the dc output.

Displaying report 1-1 of 1.