Reports until 15:58, Thursday 30 May 2013
LHO General
bubba.gateley@LIGO.ORG - posted 15:58, Thursday 30 May 2013 (6569)
Apollo crew
We moved the ergo arm and the genie lift (commonly reffered to as a "duct jack") from the LVEA to EX. We will relocate more items on THE LIST depending on crane availability. Drilling of the test stand is ongoing, 25% complete. CPB CR frame work is reassembled and ready for filters and lights pending some slight modifications for the valve motor box interference. Curtain install is 40% complete and ongoing. All CPB CR filters were tested individually in the first bay in a small clean room  with a particle counter and results were 000. We will install all filters in the clean room and retest, with results expected to be as good as previous testing. Annulus piping on GV 2 is 40% complete and ongoing.