H1 INS
jodi.fauver@LIGO.ORG - posted 14:27, Wednesday 05 June 2013 (6642)
ETMX Install Prep
The concrete floor at the spool was covered with CPStat after the PEM fence was removed. The CPB jigs were moved to the far side of the beam tube by Apollo and then the tech cleaners removed Sharpie and other egregious "stuff" from them.The ISI storage container top was removed from the VEA and taken to X-Mid. The E-module and spiral staircase were moved down to the end and then the E Module was moved into the VEA. 

A small piece of vinyl was torn up by the big pallet jack used for the ISI. Since the tear is in the Test Stand area, John is contacting the vendor to get a repair taken care of before the ISI is in place.