WP10896 Fast FC-IR lock acquisition
Vicky, Daniel, Dave:
A new h1sqz model was installed.
WP10903 Adding DQ channels
Jenne, Dave:
New h1oaf and h1bos models were installed.
WP10908 Add camera feedback channels
Daniel, Dave:
A new h1ascsqzfc model was installed.
WP10909 Add trigger option
Daniel, Dave:
A new h1ascsqzifo model was installed
WP10912 Make PEM ESD Vmon channels permanent
Ansel, Robert, Dave:
New h1pemex, h1pemey models were installed. For each, the three ADC channels reading the ESD VMON signals were changed from generic ADC_n naming to VMON names. Their aquisition rate was increased from 2K to 4K.
WP10895 New DMT network switch
Jonathan, Dan:
A new ethernet switch was installed for the GDS/DMT system.
DAQ Restart:
Dave:
The DAQ was restarted three times to support the above model changes. First restart: first version of model changes. Second restart: end station PEM chans increased to 4K. Third restart: typo fixes for the SQZ models.
The second and third restarts required a GDS1 restart.
Restart log:
Tue10Jan2023
LOC TIME HOSTNAME MODEL/REBOOT
10:46:39 h1asc0 h1ascsqzifo
10:48:13 h1lsc0 h1ascsqzfc
10:48:46 h1oaf0 h1oaf
10:49:18 h1oaf0 h1bos
10:53:50 h1iscex h1pemex
10:54:23 h1iscey h1pemey
11:44:04 h1iscex h1pemex
11:44:59 h1iscey h1pemey
12:06:57 h1asc0 h1ascsqzifo
12:07:38 h1lsc0 h1sqz
12:08:08 h1lsc0 h1ascsqzfc