Reports until 09:46, Friday 14 June 2013
LHO General
patrick.thomas@LIGO.ORG - posted 09:46, Friday 14 June 2013 (6756)
plots of dust counts
Attached are plots of dust counts requested from 5 PM June 12 to 5 PM June 13.

Both the dust monitor at location 14 in the LVEA (H2 PSL enclosure) and the dust monitor at location 16 in the LVEA (H1 PSL anteroom) are indicating calibration failures.
Non-image files attached to this report