Alarms: Dust Monitors, CDS Frontend Laser Hazard Projected work: End X electrical and computer work in air lock area Crane RGA over X and Y manifolds Fly HAM 1 door over X arm Crane HAM ISI container over X Manifold 09:14 H1-PSL Chiller alarm – Michael R. added coolant to system. Cheryl V. aligning MC-Trans on IOT2L Jonathan H. and Jim B. moving wireless equipment from End-Y to End-X Dave B, Hugo P, Chris W. recompiling H1LSC and H1ISC EY models 10:30 Michael R. Transition LVEA to laser safe 10:35 Kyle R. opening GV2 and GV7 and soft closing GV8 10:53 Dave B. restarted the DAC 11:16 Patrick T. moving items to Mid-Y for storage 14:00 Kyle going to End-Y to turn off turbo controller 15:20 Dust alarm in Diode Room 15:34 PSL chiller alarm – Thomas V. and Michael R. working on chiller system