Site recovering from multiple small power "outages" during the weekend.
Corner Station laser safe, End stations in laser hazard (Laser welding at EX)
910- Dave and Jim restoring/recovering CDS machines, power cycling I/O chassis
915 Hugh restoring HEPI pump controllers which had shutdown
1145-1600 Rick Savage recovering PSL
1200 HEPI pump controllers for corner station operating normally
1245 HEPI controller at EY operating normally
1430 Pablo working in H2 PSL Enclosure
1456 Hugh investigating BSC2
1500-1600 Kyle leak checking GV6---this will require craning leak detector over YBM
1530 Dave B doing BURT restore on PSL FSS back to 6/15 backup