Reports until 15:56, Monday 17 June 2013
LHO General
justin.bergman@LIGO.ORG - posted 15:56, Monday 17 June 2013 (6780)
ops shift

Site recovering from multiple small power "outages" during the weekend.

Corner Station laser safe, End stations in laser hazard (Laser welding at EX)

910- Dave and Jim restoring/recovering CDS machines, power cycling I/O chassis

915 Hugh restoring HEPI pump controllers which had shutdown

1145-1600 Rick Savage recovering PSL

1200 HEPI pump controllers for corner station operating normally

1245 HEPI controller at EY operating normally

1430 Pablo working in H2 PSL Enclosure

1456 Hugh investigating BSC2

1500-1600 Kyle leak checking GV6---this will require craning leak detector over YBM

1530 Dave B doing BURT restore on PSL FSS back to 6/15 backup