TITLE: 03/10 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: Got back to NLN after Fil and Rahul swapped the ETMX ESD low voltage interface chassis alog 67899 which was the cause of our locking issues since Wednesday evening.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:04 | PEM | Robert | LVEA | N | Fix sensors | 17:23 |
16:17 | FAC | Randy | Filter Cavity | N | Will be midway down FC tube | 16:29 |
16:26 | FAC | Tyler | EX VEA | N | Check on fiber connection with contractor. (SEI SC off) | 16:27 |
16:27 | CDS | Dave | Remote | N | DAC Restart - New RCG for SUSAUX and PEM | 16:54 |
17:23 | PEM | Robert | EY, EX | N | Electronics rack | 19:23 |
18:25 | PCAL | Tony | PCAL Lab | N | getting serial numbers | 19:25 |
18:36 | SUS | Jeff, Hsiang Yu | LVEA | N | HAM6 Racks, transimpedence measurement (closed Fast shutter) | 21:15 |
18:00 | FAC | Karen, | MY | N | Technical Cleaning | 18:37 |
18:00 | FAC | Kim | MX | N | Technical Cleaning | 19:33 |
19:44 | EE | Fil, Rahul | EX | N | Check on ETMX ESD | 20:15 |
20:10 | Gabriele | Arms | N | Jogging | 21:20 | |
20:29 | SUS | Rahul, Fil | EX | N | Swap ETMX ESD LV interface WP#11056 | 21:25 |
21:07 | FAC | N | RO Water alarm gone off - Bubba notified | 21:15 | ||
23:08 | PEM | Robert | LVEA | N | Sensors install (will be quiet) | ?????? |
23:28 | VAC | Gerardo, Jordan | MY | N | CP3 checks | ?????? |
23:36 | CDS | Dave | Remote | N | Restarting ETMX camera | 23:37 |
We had two locklosses on powering up. On our third locking attempt, Elenna waiting after move spots for the ADS to converge ad then slowly powered us up using INCREASE_POWER.
OMC didn't lock first time on the first locking attempt. Jenne requested DOWN and then READY_FOR_HANDOFF and it found it no issue.
TJ did tell us the instructions for locking OMC by hand, see below, tagging OpsInfo: