Displaying report 1-1 of 1.
Reports until 16:01, Friday 10 March 2023
H1 General (OpsInfo)
camilla.compton@LIGO.ORG - posted 16:01, Friday 10 March 2023 (67897)
Ops Day Shift Summary

TITLE: 03/10 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: Got back to NLN after Fil and Rahul swapped the ETMX ESD low voltage interface chassis alog 67899 which was the cause of our locking issues since Wednesday evening. 
LOG:          

Start Time System Name Location Lazer_Haz Task Time End
16:04 PEM Robert LVEA N Fix sensors 17:23
16:17 FAC Randy Filter Cavity N Will be midway down FC tube 16:29
16:26 FAC Tyler EX VEA N Check on fiber connection with contractor. (SEI SC off) 16:27
16:27 CDS Dave Remote N DAC Restart - New RCG for SUSAUX and PEM 16:54
17:23 PEM Robert EY, EX N Electronics rack 19:23
18:25 PCAL Tony PCAL Lab N getting serial numbers 19:25
18:36 SUS Jeff, Hsiang Yu LVEA N HAM6 Racks, transimpedence measurement (closed Fast shutter) 21:15
18:00 FAC Karen, MY N Technical Cleaning 18:37
18:00 FAC Kim MX N Technical Cleaning 19:33
19:44 EE Fil, Rahul EX N Check on ETMX ESD 20:15
20:10   Gabriele Arms N Jogging 21:20
20:29 SUS Rahul, Fil EX N Swap ETMX ESD LV interface WP#11056 21:25
21:07 FAC     N RO Water alarm gone off - Bubba notified 21:15
23:08 PEM Robert LVEA N Sensors install (will be quiet) ??????
23:28 VAC Gerardo, Jordan MY N CP3 checks ??????
23:36 CDS Dave Remote N Restarting ETMX camera 23:37

We had two locklosses on powering up. On our third locking attempt, Elenna waiting after move spots for the ADS to converge ad then slowly powered us up using INCREASE_POWER.

OMC didn't lock first time on the first locking attempt. Jenne requested DOWN and then READY_FOR_HANDOFF and it found it no issue. 

TJ did tell us the instructions for locking OMC by hand, see below, tagging OpsInfo:

Displaying report 1-1 of 1.