Travis, Betsy, Joe O'Dell (RAL, UK)
This afternoon, after jockying the genie lift and the Upper Structure numerous times under the test stand, we finally managed to install it on the BSC 9 ISI which is parked on the test stand. The QUAD is tucked into a corner of the ISI with only inches of room to between it and the test stand on 2 sides. This will make for another painful assembly due to this. At least there's a gap between a few stages on the ISI which we can crawl through to reach areas we need to access on the QUAD.