Displaying report 1-1 of 1.
Reports until 16:39, Wednesday 19 June 2013
H1 SUS
mark.barton@LIGO.ORG - posted 16:39, Wednesday 19 June 2013 - last comment - 12:25, Thursday 20 June 2013(6809)
PUM

Mark B. and Gerardo

(This alog is based on final numbers from Gerardo - a typo was discovered in one of the ear positions used in discussions yesterday.) 

The PUM "ETM04" had been selected for use in the ETMx quad at LHO. While reviewing its history in preparation for welding, Betsy, Gerardo and Angus discovered that one ear, on the S4 surface, had been flagged as 0.18 mm from the front-back centerline, outside the 0.1 mm tolerance. (It was one of the first to have ears bonded, before the procedure had been entirely perfected.) Even a small front-back error produces a large pitch torque from the weight of the test mass below, which can produce a significant static pitch in the final suspended chain. 

The positions of the ears and prisms are as in the first attachment. The prism on the S4 surface is at -0.07 mm, which adds to the pitch torque. The ear and and prism on the S3 surface are at 0.04 mm, which subtracts a small net torque. The net expected pitch imbalance is per the second attachment: 4.3, 5.4, 3.2 and 2.3 mrad at the various masses, from the bottom up.

The average misposition of the ears is (0.18+0.04)/2 = +0.11 mm. Since it is not possible to remove and reposition the ears after several years of curing of the bonds, to salvage the mass requires moving the prisms to an average position of +0.055 mm (the weighting of the prisms is -2 that of the ears because the tension on the associated wires is double, and upwards rather than downwards). Since removing prisms is time-consuming and slightly risky, it is preferable to move just one if possible. The easiest possibility is to move the S4 prism from -0.07 mm to +0.07 mm, so that the average is (0.07+0.04)/2 = +0.055 mm as desired. This means that the PUM will sit at a yaw angle set by the prisms of (0.07-0.04)/326.5 = 0.09 mrad, and the test mass will be a yaw angle set by the S4 ear and prism of (0.18-0.07)/326.5 = 0.34 mrad. These are small enough to be easily trimmed statically and should have a negligible effect on the dynamics. (A comparison of TFs with and without the misposition and fix will be posted as a comment.)

However this moving of the prism can't be done in time to use the assembled welding crew in the next few days, so PUM "ETM03" has been prepared and allocated to LHO ETMx (per alog 6800), and, assuming a quick and successful rework, "ETM04" will be used next up as ETMx at LLO in a few weeks.

Images attached to this report
Comments related to this report
betsy.weaver@LIGO.ORG - 18:29, Wednesday 19 June 2013 (6815)

Note - the discovery of the out-of-tolerance ear is due entirely to the diligence of Gerardo!  We would have scratched our heads with a horribly pitched QUAD in many weeks time if he had not spotted this.

 

Gerardo and Gerardo Jr. have placed the ETM04 S4-side down in a bath of acetone for the night.  Soaking started around 4pm today.

mark.barton@LIGO.ORG - 12:25, Thursday 20 June 2013 (6823)

As promised above, I took the production case (20120601TMproductionTM) of the quad model, and created a custom version of the model with provision for perturbations to the ear and prism positions at the PUM, and a custom case (20120601TMproductionTM_PUMpert) with numerical values corresponding to the proposed rework of PUMETM04. These can be found in the SUS SVN at 

        ^/trunk/Common/MathematicaModels/QuadLite2Lateral/mark.barton/20120601TMproductionTM_PUMpert/

I then calculated the equilibrium position and generated top mass to optic TFs for all DOFs. See attached PDF.

As might be hoped, the equilibrium position has essentially no pitch, and a trivial amount of yaw that agrees fairly well with the back-of-the envelope calculation above.

The TFs are not distiguishable by eye from those with the stock model.