- The Apollo crew did some degrouting work at the old HAM8 site in the LVEA.
- Patrick attempted to track down a source of dust with the monitors, possibly coincident with the degrouting or a maintenance problem with the monitors themselves.
- A Reiboldt contractor removed sound-dampening padding from between the LVEA and the mechanical room.