Reports until 17:19, Thursday 20 June 2013
H1 PEM
james.batch@LIGO.ORG - posted 17:19, Thursday 20 June 2013 (6830)
Shut down h1pemmx to rearrange network connections
The h1pemmx front-end is powered down to move network connections and reroute timing.  We anticipate that it will be back Friday by 12:00 Noon.