The horizontal actuator on the NE corner of BSC 7 has been temporarily installed. There is no official procedure for installing these yet so the horizontal actuator is there merely to help size the scaffolding for the BSC. It is now held in place with 3 angle brackets. The plans are to remove the horizontal actuator once the measurements have been taken.
The horizontal actuator installed-dimensions were taken and has now been uninstalled.