Displaying report 1-1 of 1.
Reports until 13:40, Friday 21 June 2013
H1 CDS
james.batch@LIGO.ORG - posted 13:40, Friday 21 June 2013 (6842)
End X CDS networking has been installed.
The End-X network switches for front-end and daq traffic have been connected, allowing the front end computers for the end-x to be started when needed.  The RFM switch has also been connected between the corner and end-x.
Displaying report 1-1 of 1.