Displaying report 1-1 of 1.
Reports until 22:26, Friday 07 April 2023
H1 ISC
elenna.capote@LIGO.ORG - posted 22:26, Friday 07 April 2023 - last comment - 02:16, Monday 10 April 2023(68519)
New DHARD high power controllers

I have implemented new DHARD P and Y high power controllers. The DHARD Y controller is also designed to have lower noise than the previous lownoise controller. Both of these controllers have more low frequency suppression and are designed using a 300 kW radiation pressure suspension plant. I have attached the modeled open loop gain and close loop suppression for each loop.

These controllers will be turned on in lownoise ASC after the RPC turns off. The DHARD Y gain will be lowered to -25, and then the controller engaged. The DHARD P gain will stay the same. Both new controller filters are located in FM5. They will be turned on in addition to the filters already engaged for the loops.

I have also increased the DSOFT P gain in lownoise ASC to give more stability at 0.5 Hz when we go to higher power.

Everything has been guardianized.

Images attached to this report
Comments related to this report
elenna.capote@LIGO.ORG - 02:16, Monday 10 April 2023 (68533)

Evan and I made some measurements of both DHARD loops. DHARD P looks fine, but DHARD Y could use an additional boost around 0.5 Hz. Evan made some edits to FM5 to give us back some phase and added a resG filter in FM3. We are also back to operating DHARD Y with a gain of -40. This should maintain the new lower noise level at 20 Hz.

Displaying report 1-1 of 1.