(Corey, Keita, Lisa, Matt, Virginio)
In-Vacuum ISC Table
Lisa & Matt finished up laying out optics on the table (this included installing the mirror on the Beam Diverter, and installing the High Power Beam Dump [although one of the ceramic legs broke & will need to be replaced]). This afternoon they were approaching point of aligning optics.
Setting Up Alignment Laser & Telescope Work
Virginio & Keita worked on setting up the alignment laser. Before using it, they wanted to measure the beam profile of the laser. The Telescope Assy was suspended from its tooling. Made an Ameristat "tent" to enclose the Telescope and the Ag-plated mirrors when they are ready to be installed. The mirrors will be insalled when the desiccant packs arrive on site.
Clean Up, ISC-ing, Photos, Feedthru, & Humidity
Continued putting hardware away, and working on making ICS Assy Loads for the TMS. Continue to upload photos of progress, here. Helped Filiberto install the final roof-side cable to the TMS feed-thru. The humidity in the Lab was 34-40%.